Answer :
Answer:
Option a
Explanation:
The Critical Path Method is the arrangement of booked exercises that decides the term of the task. These planned exercises must be performed if the venture is to be viewed as a triumph.
Therefore, options b, c, d and e can't be true because:
b. Activities in the Critical Path Method has no or zero slack.
c. The duration of the critical path in CPM determined on the basis of the latest activity and the earliest initiation.
d. The CPM method schedules the activity of the longest duration.