Answer :
Answer:
1a. Predetermined overheard rate is $20.8
1b. Product cost for each product:
Xactive ($) Pathbreaker ($)
113.72 86.4
Explanation:
1(a)
Predetermined overheard rate is calculated with formula:
Budgeted Cost
Activity Level
For Rocky Mountain:
= $2,687,360
129,200
= $20.8
1 (b) Product cost involves the total cost incurred directly as a result of making a product. Product cost is calculated by adding direct material cost, direct labour cost and manufacturing overheard together.
Product cost
Xactive Pathbreaker
Direct material 65.60 51.80
Direct labour cost 19.00 13.80
Manufacturing overheard($20.8) 29.12 20.8
113.72 86.4