An overpass is being built over the PVI of an existing equal-tangent sag curve. The sag curve has a 70 mi/h design speed and G1=-5%, G2=+3%. Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI. Ignore the cross-sectional width of the overpass.

Answer :

Answer: Resultant elevation will be 30.98 ft

${teks-lihat-gambar} hamzafarooqi188
${teks-lihat-gambar} hamzafarooqi188

Other Questions