The following are Acme's production costs for the quarter ended September 30th:

Direct materials 180,000
Direct labor 130,000
Factory overhead 42,000

What amount of costs should be traced to specific products in the process?

Answer :

hyderali230

Answer:

$310,000

Explanation:

Direct costs are all the costs which is directly traceable to the product. These are the costs which can be assigned specifically to a product / project / department.

Direct Material = $180,000

Direct Labor = $130,000

Total Direct Cost = $180,000 + $130,000 = $310,000

$310,000 should be traced to specific products in the process.