Answer :
Solution
For this case we can find the rate of painting on this way:
14 portratits/ 28 hours= 1/2 portraits /hour
And then we can find the time required with this operation:
[tex]\frac{2\text{portraits}}{0.5\text{ por/hour}}=4hours[/tex]Then the final answer for this case would be 4 hours