the standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead) based on 100% of normal capacity of 80,000 machine hours. the standard cost and the actual cost of factory overhead for the production of 15,000 units during august were as follows: