the materials requirement plan (mrp) is a long-range materials plan that converts information regarding end-items in the mps into a set of time-phased component and part requirements

Answer :

A macro-level, long-term planning tool is resource needs planning (RRP). A long-range materials plan called the materials requirement plan (MRP) transforms information from the MPS's end-item list into a list of time-phased component and part requirements.

The materials requirement plan (mrp) is a long-range materials plan that converts information regarding end-items in the mps into a set of time-phased component and part requirements

What is materials requirement plan?

A technique called MRP is used to schedule manufacturing production. With the aim of satisfying customer needs and boosting overall productivity, it recognizes necessary materials, estimates amounts, predicts when items will be required to match the production plan, and manages supply scheduling.

The three fundamental inputs of an MRP system (BOM)

  • Master Production Schedule (MPS),
  • Inventory Status File (ISF), and
  • Bill of Materials (BOM)